Home > Oyster Shell & D. G. > Oyster Flour Mix & D. G. Blends > White Bocce Blend >

White Bocce Blend Supersack Per Ton

White D.G. and Oyster Shell Blend Supersack
White D.G. and Oyster Flour Blend
 
Alternative Views:


Call or Email us for a shipping quote
Price Per 2000 Pounds $610.00
Sale Price: $430.00
Savings: $180.00
Special Instructions: Marine composed oyster flour
Custom Field 2: No experience needed for excellent results.
Custom Field 3: One day or less for most projects. Figure 15 minutes per 50 pound for a finished project.
Custom Field 4: Contractor grade wheelbarrow, landscape rake, heavy duty push broom, garden hose
Custom Field 5: Geo Textile Weed control fabric, wood, steel or plastic edging


Availability:: Usually Ships in 24 to 48 Hours
Product Code: BOS182XSSK
Qty:

Description Technical Specs
 
White Bocce Blend Supersack Per Ton

Detailed Spec sheet for the blend is given below.



The recreational use of an Italian Bocce Ball Court provides an excellent way to spend afternoons and evenings having backyard fun with family and friends.
For those players who are in a particular use or want to have large to full size 13 x 91-foot courts with a hard and very fast playing surface.
Shipping
In California, Arizona, and Nevada blended materials are shipped in bulk amounts up to 25 tons. Smaller orders in 2,000 and 3,000-pound SuperEarth-sacks, and can be shipped anywhere in the USA and Canada.

Features
  • One Ton of Decomposed granite and Oyster Flour Bocce Court Spread Covers:
    150 square feet at 1-1/2" deep. Thins out over short amount of time.
    100 square feet at 2-1/2" deep. Very good coverage.
    90 square feet at 3" deep. Ideal long term coverage.

    One Square Yard
    Bocce Court Spread Covers:
    175 square feet at 1-1/2" deep. Thins out over short amount of time.
    125 square feet at 2-1/2" deep. Very good coverage.
    115 square feet at 3" deep. Ideal long term coverage.

    The square foot coverage per ton of gravel will vary slightly with the surface and designs of the project, waste etc. will affect area coverage.